{"id":15852,"date":"2024-01-20T08:36:22","date_gmt":"2024-01-20T12:36:22","guid":{"rendered":"https:\/\/www.elalto.gob.bo\/noticias\/?p=15852"},"modified":"2024-01-20T08:36:22","modified_gmt":"2024-01-20T12:36:22","slug":"el-drenaje-pluvial-prolongacion-juan-pablo-ii-tramo-iv-sera-realidad-con-casi-bs-4-millones","status":"publish","type":"post","link":"https:\/\/elalto.gob.bo\/noticias\/?p=15852","title":{"rendered":"El drenaje pluvial prolongaci\u00f3n Juan Pablo II tramo IV ser\u00e1 realidad con casi Bs 4 millones"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">PRENSA GAMEA | Sab 20.01.24<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Con una inversi\u00f3n de Bs 3.908.609, la construcci\u00f3n del drenaje pluvial, prolongaci\u00f3n avenida Juan Pablo II tramo IV, (carretera La Paz-Copacabana), ser\u00e1 realidad para beneficio de m\u00e1s de 44.000 habitantes del Distrito 7, adem\u00e1s que es una v\u00eda internacional.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El tramo IV (Avenida Perif\u00e9rica \u2013 San Roque) se encontraba paralizada por casi tres a\u00f1os y ahora ser\u00e1 completada para controlar y evacuar las aguas pluviales que llegan superficialmente a la carretera.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cEstaba abandonado el tramo IV de San Roque donde nosotros vamos a hacer la ejecuci\u00f3n correspondiente, nosotros somos la unidad solicitante y quien va a ejecutar es una empresa, con la fiscalizaci\u00f3n de SMIP (Secretar\u00eda Municipal de infraestructura P\u00fablica)\u201d, inform\u00f3 el secretario Municipal de Agua, Saneamiento, Gesti\u00f3n Ambiental y Riesgos, Gabriel Pari.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El servidor p\u00fablico explic\u00f3 que en 60 d\u00edas se har\u00e1 la licitaci\u00f3n y, luego, en cinco d\u00edas se estima que la empresa adjudicada comience la construcci\u00f3n de la obra compuesta por una b\u00f3veda con estructura de hormig\u00f3n armado.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La culminaci\u00f3n de este proyecto de embovedado, en el que participan el gobierno departamental y municipal, permitir\u00e1 a la Administradora Boliviana de Carreteras (ABC) proseguir con el asfaltado de la carretera internacional.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El jueves, la Alcald\u00eda socializ\u00f3 el proyecto con vecinos y organizaciones sociales a los cuales se explic\u00f3 los alcances de la obra.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\/\/\/<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">SDC<\/p>\n","protected":false},"excerpt":{"rendered":"<p>PRENSA GAMEA | Sab 20.01.24 Con una inversi\u00f3n de Bs 3.908.609, la construcci\u00f3n del drenaje pluvial, prolongaci\u00f3n avenida Juan Pablo II tramo IV, (carretera La Paz-Copacabana), ser\u00e1 realidad para beneficio de m\u00e1s de 44.000 habitantes del Distrito 7, adem\u00e1s que es una v\u00eda internacional. El tramo IV (Avenida Perif\u00e9rica \u2013 San Roque) se encontraba paralizada [&hellip;]<\/p>\n","protected":false},"author":16,"featured_media":15853,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"content-type":"","footnotes":""},"categories":[161,15,402],"tags":[427,430,428,429],"class_list":["post-15852","post","type-post","status-publish","format-standard","has-post-thumbnail","category-actividades","category-gestion","category-obras","tag-drenaje","tag-embovedado","tag-pluvial","tag-tramo"],"_links":{"self":[{"href":"https:\/\/elalto.gob.bo\/noticias\/index.php?rest_route=\/wp\/v2\/posts\/15852","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elalto.gob.bo\/noticias\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/elalto.gob.bo\/noticias\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/elalto.gob.bo\/noticias\/index.php?rest_route=\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/elalto.gob.bo\/noticias\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=15852"}],"version-history":[{"count":1,"href":"https:\/\/elalto.gob.bo\/noticias\/index.php?rest_route=\/wp\/v2\/posts\/15852\/revisions"}],"predecessor-version":[{"id":15854,"href":"https:\/\/elalto.gob.bo\/noticias\/index.php?rest_route=\/wp\/v2\/posts\/15852\/revisions\/15854"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/elalto.gob.bo\/noticias\/index.php?rest_route=\/wp\/v2\/media\/15853"}],"wp:attachment":[{"href":"https:\/\/elalto.gob.bo\/noticias\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=15852"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/elalto.gob.bo\/noticias\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=15852"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elalto.gob.bo\/noticias\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=15852"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}