{"id":3049,"date":"2022-03-28T14:42:00","date_gmt":"2022-03-28T14:42:00","guid":{"rendered":"https:\/\/www.elalto.gob.bo\/noticias\/?p=3049"},"modified":"2022-03-28T19:43:09","modified_gmt":"2022-03-28T19:43:09","slug":"inicia-construccion-del-pavimento-flexible-de-la-avenida-bolivia-del-distrito-7","status":"publish","type":"post","link":"https:\/\/elalto.gob.bo\/noticias\/?p=3049","title":{"rendered":"Inicia construcci\u00f3n del pavimento flexible de la avenida Bolivia del Distrito 7"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>PRENSA GAMEA | Lun 28.03.22<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El director de Obras Municipales, Limbert Apaza, inform\u00f3 el lunes que se inici\u00f3 la construcci\u00f3n del pavimento flexible de la avenida Bolivia del Distrito 7, el proyecto se ejecuta en 600 metros de longitud.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cLa obra consiste en dos carriles, de subida y llegada, cada carril consta de 10.50 metros de ancho en una longitud de 600 metros, si hablamos en cantidad de metros cuadrados es de 13.931 metros cuadrados eso estaremos ejecutando en esta gesti\u00f3n\u201d, destac\u00f3 el Director.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Actualmente la avenida es de tierra, una vez ejecutado el asfalto flexible beneficiar\u00e1 a m\u00e1s de 200 mil habitantes del sector.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El presupuesto del proyecto supera los 4 millones de bolivianos y se considera una obra de gran magnitud que ser\u00e1 estrenada en esta gesti\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cLa v\u00eda es de tierra, no tuvo ning\u00fan tipo de mejoramiento, a partir de hoy estamos interviniendo para el mejoramiento del lugar y de los vecinos del Distrito 7\u201d, finaliz\u00f3 Apaza.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>PRENSA GAMEA | Lun 28.03.22 El director de Obras Municipales, Limbert Apaza, inform\u00f3 el lunes que se inici\u00f3 la construcci\u00f3n del pavimento flexible de la avenida Bolivia del Distrito 7, el proyecto se ejecuta en 600 metros de longitud. \u201cLa obra consiste en dos carriles, de subida y llegada, cada carril consta de 10.50 metros [&hellip;]<\/p>\n","protected":false},"author":17,"featured_media":3050,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"content-type":"","footnotes":""},"categories":[15],"tags":[],"class_list":["post-3049","post","type-post","status-publish","format-standard","has-post-thumbnail","category-gestion"],"_links":{"self":[{"href":"https:\/\/elalto.gob.bo\/noticias\/index.php?rest_route=\/wp\/v2\/posts\/3049","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elalto.gob.bo\/noticias\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/elalto.gob.bo\/noticias\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/elalto.gob.bo\/noticias\/index.php?rest_route=\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/elalto.gob.bo\/noticias\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3049"}],"version-history":[{"count":1,"href":"https:\/\/elalto.gob.bo\/noticias\/index.php?rest_route=\/wp\/v2\/posts\/3049\/revisions"}],"predecessor-version":[{"id":3051,"href":"https:\/\/elalto.gob.bo\/noticias\/index.php?rest_route=\/wp\/v2\/posts\/3049\/revisions\/3051"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/elalto.gob.bo\/noticias\/index.php?rest_route=\/wp\/v2\/media\/3050"}],"wp:attachment":[{"href":"https:\/\/elalto.gob.bo\/noticias\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3049"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/elalto.gob.bo\/noticias\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3049"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elalto.gob.bo\/noticias\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3049"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}