{"id":31102,"date":"2026-11-12T19:56:33","date_gmt":"2026-11-12T23:56:33","guid":{"rendered":"https:\/\/elalto.gob.bo\/noticias\/?p=31102"},"modified":"2026-11-12T19:56:36","modified_gmt":"2026-11-12T23:56:36","slug":"alcalde-reactiva-maquinaria-abandonada-y-ejecuta-bacheo-con-inversion-de-cerca-de-bs-25-mm","status":"publish","type":"post","link":"https:\/\/elalto.gob.bo\/noticias\/?p=31102","title":{"rendered":"Alcalde reactiva maquinaria abandonada y ejecuta bacheo con inversi\u00f3n de cerca de Bs 2,5 MM"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><em>PRENSA GAMEA \/ Jue 12.11.2026<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El Gobierno Aut\u00f3nomo Municipal de El Alto (GAMEA) puso en marcha el proyecto semana intesiva de bacheo y recapado de v\u00edas utilizando maquinaria propia que estaba archivada, sin uso y pr\u00e1cticamente botada.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El Alcalde, Eliser Roca Tancara, explic\u00f3 que a las gestiones municipales anteriores les conven\u00eda m\u00e1s contratar empresas que usar la maquinaria municipal por lo que ahora, esa maquinaria fue reactivada y puesta en movimiento para ejecutar los trabajos de asfaltado.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"678\" src=\"https:\/\/elalto.gob.bo\/noticias\/wp-content\/uploads\/2026\/11\/131284-1024x678.jpg\" alt=\"\" class=\"wp-image-31103\" srcset=\"https:\/\/elalto.gob.bo\/noticias\/wp-content\/uploads\/2026\/11\/131284-1024x678.jpg 1024w, https:\/\/elalto.gob.bo\/noticias\/wp-content\/uploads\/2026\/11\/131284-300x198.jpg 300w, https:\/\/elalto.gob.bo\/noticias\/wp-content\/uploads\/2026\/11\/131284-767x508.jpg 767w, https:\/\/elalto.gob.bo\/noticias\/wp-content\/uploads\/2026\/11\/131284-1536x1017-1.jpg 1536w, https:\/\/elalto.gob.bo\/noticias\/wp-content\/uploads\/2026\/11\/131284-2048x1356.jpg 2048w, https:\/\/elalto.gob.bo\/noticias\/wp-content\/uploads\/2026\/11\/131284-860x569.jpg 860w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Sobre el uso inapropiado de la maquinaria y las denuncias contra la gesti\u00f3n anterior, incluida la exalcaldesa Eva Copa, la primera autoridad edil inform\u00f3 que existen varios procesos en contra de la anterior gesti\u00f3n, de los cuales tres ya han sido recibidos por el Ministerio P\u00fablico y van a ser ejecutados por la Fiscal\u00eda.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cSon temas que corresponden a la Fiscal\u00eda, a nosotros nos corresponde hacer la denuncia y esta instancia, la Fiscal\u00eda, ser\u00e1 quien determinar\u00e1\u201d, afirm\u00f3.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"678\" src=\"https:\/\/elalto.gob.bo\/noticias\/wp-content\/uploads\/2026\/11\/131280-1024x678.jpg\" alt=\"\" class=\"wp-image-31104\" srcset=\"https:\/\/elalto.gob.bo\/noticias\/wp-content\/uploads\/2026\/11\/131280-1024x678.jpg 1024w, https:\/\/elalto.gob.bo\/noticias\/wp-content\/uploads\/2026\/11\/131280-300x198.jpg 300w, https:\/\/elalto.gob.bo\/noticias\/wp-content\/uploads\/2026\/11\/131280-767x508.jpg 767w, https:\/\/elalto.gob.bo\/noticias\/wp-content\/uploads\/2026\/11\/131280-1536x1017-1.jpg 1536w, https:\/\/elalto.gob.bo\/noticias\/wp-content\/uploads\/2026\/11\/131280-2048x1356.jpg 2048w, https:\/\/elalto.gob.bo\/noticias\/wp-content\/uploads\/2026\/11\/131280-860x569.jpg 860w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Respecto a los trabajos de mejoramiento, el Alcalde remarc\u00f3 que en esta primera fase se est\u00e1 ejecutando asfalto caliente en 6.070 metros cuadrados, adem\u00e1s de bacheo profundo con asfalto fr\u00edo en 1.050 metros cuadrados. Las obras se est\u00e1n ejecutando en la Avenida Bolivia, Distrito 2 y Distrito 3, Avenida C\u00edvica, Avenida de la Polic\u00eda, Distrito 1, Avenida Juan Pablo II y Avenida Franco Valle.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"678\" src=\"https:\/\/elalto.gob.bo\/noticias\/wp-content\/uploads\/2026\/11\/131300-1024x678.jpg\" alt=\"\" class=\"wp-image-31105\" srcset=\"https:\/\/elalto.gob.bo\/noticias\/wp-content\/uploads\/2026\/11\/131300-1024x678.jpg 1024w, https:\/\/elalto.gob.bo\/noticias\/wp-content\/uploads\/2026\/11\/131300-300x198.jpg 300w, https:\/\/elalto.gob.bo\/noticias\/wp-content\/uploads\/2026\/11\/131300-767x508.jpg 767w, https:\/\/elalto.gob.bo\/noticias\/wp-content\/uploads\/2026\/11\/131300-1536x1017-1.jpg 1536w, https:\/\/elalto.gob.bo\/noticias\/wp-content\/uploads\/2026\/11\/131300-2048x1356.jpg 2048w, https:\/\/elalto.gob.bo\/noticias\/wp-content\/uploads\/2026\/11\/131300-860x569.jpg 860w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">La inversi\u00f3n que se est\u00e1 realizando en esta primera fase es de cerca de Bs 2,5 millones, en la semana que se ha denominado del bacheo y recapado, y anunci\u00f3 que en las siguientes semanas se continuar\u00e1 con este trabajo, una vez que se vuelva a programar m\u00e1s trabajos.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En todas se realizar\u00e1 el recapeo con asfalto fr\u00edo y caliente, con el despliegue de cuadrillas y maquinaria pesada, en esta primera etapa y como el trabajo es integral luego se continuar\u00e1 con la mejora de jardineras, limpieza y mantenimiento de \u00e1reas verdes, cunetas, demarcaci\u00f3n horizontal en los diferentes tramos, repintado de pasos peatonales, entre otros.<br>\/\/\/\/\/\/<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>PRENSA GAMEA \/ Jue 12.11.2026 El Gobierno Aut\u00f3nomo Municipal de El Alto (GAMEA) puso en marcha el proyecto semana intesiva de bacheo y recapado de v\u00edas utilizando maquinaria propia que estaba archivada, sin uso y pr\u00e1cticamente botada. El Alcalde, Eliser Roca Tancara, explic\u00f3 que a las gestiones municipales anteriores les conven\u00eda m\u00e1s contratar empresas que [&hellip;]<\/p>\n","protected":false},"author":17,"featured_media":31106,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[402],"tags":[],"class_list":["post-31102","post","type-post","status-publish","format-standard","has-post-thumbnail","category-obras"],"_links":{"self":[{"href":"https:\/\/elalto.gob.bo\/noticias\/index.php?rest_route=\/wp\/v2\/posts\/31102","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elalto.gob.bo\/noticias\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/elalto.gob.bo\/noticias\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/elalto.gob.bo\/noticias\/index.php?rest_route=\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/elalto.gob.bo\/noticias\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=31102"}],"version-history":[{"count":1,"href":"https:\/\/elalto.gob.bo\/noticias\/index.php?rest_route=\/wp\/v2\/posts\/31102\/revisions"}],"predecessor-version":[{"id":31107,"href":"https:\/\/elalto.gob.bo\/noticias\/index.php?rest_route=\/wp\/v2\/posts\/31102\/revisions\/31107"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/elalto.gob.bo\/noticias\/index.php?rest_route=\/wp\/v2\/media\/31106"}],"wp:attachment":[{"href":"https:\/\/elalto.gob.bo\/noticias\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=31102"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/elalto.gob.bo\/noticias\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=31102"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elalto.gob.bo\/noticias\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=31102"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}